• Afhalen na 1 uur in een winkel met voorraad
  • Gratis thuislevering in België vanaf € 30
  • Ruim aanbod met 7 miljoen producten
  • Afhalen na 1 uur in een winkel met voorraad
  • Gratis thuislevering in België vanaf € 30
  • Ruim aanbod met 7 miljoen producten
  1. Boeken
  2. Non-fictie
  3. Mens & Maatschappij
  4. Sociologie
  5. Assessment of the Results of External Independent Reviews for U.S. Department of Energy Projects
€ 44,45
+ 88 punten
Pre-order nu, verschijningsdatum onbekend
Eenvoudig bestellen
Veilig betalen
Gratis thuislevering vanaf € 30 (via bpost)
Gratis levering in je Standaard Boekhandel

Omschrijving

Peer review is an essential component of engineering practice and other scientific and technical undertakings. Peer reviews are conducted to ensure that activities are technically adequate, competently performed, and properly documented; to validate assumptions, calculations, and extrapolations; and to assess alternative interpretations, methodologies, acceptance criteria, and other aspects of the work products and the documentation that support them. Effective peer reviews are conducted in an environment of mutual respect, recognizing the contributions of all participants. Their primary objective is to help the project team achieve its goals. Reviews also contribute to quality assurance, risk management, and overall improvement of the management process.


The U.S. Department of Energy (DOE) conducts different types of peer reviews at the different stages of a project, including reviews to assess risks and other factors related to design, safety, cost estimates, value engineering, and project management. Independent project reviews (IPRs) are conducted by federal staff not directly affiliated with the project or program and management and operations (M&O) contractors. External independent reviews (EIRs) are overseen by the Office of Engineering and Construction Management and conducted by contractors external to the department. EIRs are the primary focus of this report. However, the committee found that, in many cases, IPRs are explicitly used as preparation for or as preliminary reviews prior to EIRs. Thus, because IPRs are integral to the review process in DOE, they are also discussed because they might have an effect on EIRs.


In October 2000, DOE issued Order 413.3, Program and Project Management for the Acquisition of Capital Assets (DOE, 2000). The order established a series of five critical decisions (CDs), or major milestones, that require senior management review and approval to ensure that a project satisfies applicable mission, design, security, and safety requirements: approve mission need, approve alternative selection and cost range, approve performance baseline, approve start of construction, and approve start of operations or project closeout.


Assessment of the Results of External Independent Reviews for U. S. Department of Energy Projects summarizes the results.

Specificaties

Betrokkenen

Auteur(s):
Uitgeverij:

Inhoud

Aantal bladzijden:
74
Taal:
Engels

Eigenschappen

Productcode (EAN):
9780309106399
Verschijningsdatum:
10/05/2007
Uitvoering:
Paperback
Bestandsformaat:
Trade paperback (VS)
Afmetingen:
216 mm x 279 mm
Standaard Boekhandel

Alleen bij Standaard Boekhandel

+ 88 punten op je klantenkaart van Standaard Boekhandel
MUST-HAVES

Hier bloeit iets

Nu dubbele punten op onze selectie nieuwe titels
MUST-HAVES
Hier bloeit iets
AANGERADEN

Onze cadeautips

voor Vaderdag
AANGERADEN
Onze cadeautips voor Vaderdag
VADERDAG ACTIE

Alleen in onze winkels: kortingsbon van € 10 voor e-books

bij een Vivlio e-reader
VADERDAG ACTIE
Vivlio e-reader + € 10 aan e-books
Standaard Boekhandel

Beoordelingen

We publiceren alleen reviews die voldoen aan de voorwaarden voor reviews. Bekijk onze voorwaarden voor reviews.