• Afhalen na 1 uur in een winkel met voorraad
  • Gratis thuislevering in België vanaf € 30
  • Ruim aanbod met 7 miljoen producten
  • Afhalen na 1 uur in een winkel met voorraad
  • Gratis thuislevering in België vanaf € 30
  • Ruim aanbod met 7 miljoen producten

Building a Project Work Breakdown Structure

Visualizing Objectives, Deliverables, Activities, and Schedules

Dennis P Miller
€ 236,95
+ 473 punten
Uitvoering
Levering 1 à 2 weken
Eenvoudig bestellen
Veilig betalen
Gratis thuislevering vanaf € 30 (via bpost)
Gratis levering in je Standaard Boekhandel

Omschrijving

Most people do not truly understand a concept until they can visualize it. This applies to all fields, including Project Management. The best way to effectively manage projects is to help your team visualize the end result as well as the steps needed to achieve that result.
Help Your Team Visualize the Right Path to Success

Building a Project Work Breakdown Structure: Visualizing Objectives, Deliverables, Activities, and Schedules employs a diagram approach to project planning and scheduling. This useful tool empowers business professionals to take control of and successfully communicate their projects, ensuring they are completed on time with their targeted impact.

Industry professional Dennis P. Miller, a consultant to leading Fortune 500 companies, thoroughly explains the keys to an effective Work Breakdown Structure (WBS) through an Eight Step Process. He has refined this process over a period of twenty years, applying it to over 100 projects ranging from software development to social events. The Eight Step Process starts with a concentrated effort to define the project through its deliverables. The middle steps walk the project team through a process of activity definition and sequencing and resource assignment. Finally, the last steps involve estimating the duration and verifying the project timeline.

Not Just What to Do, But How to Do It!

This is a hands-on volume that includes a practice section for each of the eight steps, providing readers with real examples of how the author has successfully applied this process. The result of its application is a visualization of the project's objectives, deliverables, activities, and schedules. Over 130 illustrations enrich the instructions. Project managers are assured of success by following the simple tools in this unique and comprehensive volume.

Specificaties

Betrokkenen

Auteur(s):
Uitgeverij:

Inhoud

Aantal bladzijden:
262
Taal:
Engels
Reeks:

Eigenschappen

Productcode (EAN):
9781138423275
Verschijningsdatum:
27/07/2017
Uitvoering:
Hardcover
Formaat:
Genaaid
Afmetingen:
156 mm x 232 mm
Gewicht:
480 g
Standaard Boekhandel

Alleen bij Standaard Boekhandel

+ 473 punten op je klantenkaart van Standaard Boekhandel
CADEAU

Suske en Wiske & Jommeke trakteren

Koop hun avonturen nu voor slechts € 5!
CADEAU
actie strips
CADEAU

Een goed verhaal is geld waard

Krijg nu een € 4 voucher bij elke aankoop vanaf € 40
CADEAU
Terugkeeractie
E-BOOK ACTIE

Tot meer dan 50% korting

op een selectie e-books
E-BOOK ACTIE
E-bookactie korting
Standaard Boekhandel

Beoordelingen

We publiceren alleen reviews die voldoen aan de voorwaarden voor reviews. Bekijk onze voorwaarden voor reviews.