• Afhalen na 1 uur in een winkel met voorraad
  • Gratis thuislevering in België vanaf € 30
  • Ruim aanbod met 7 miljoen producten
  • Afhalen na 1 uur in een winkel met voorraad
  • Gratis thuislevering in België vanaf € 30
  • Ruim aanbod met 7 miljoen producten

Rov '86: Remotely Operated Vehicles

Technology Requirements--Present and Future Proceedings of the Rov '86 Conference Organized by the Marine Technology Society, the Society for Underwater Technology and the Association of Offshore Diving Contractors and Held in Aberdeen, Uk,24--26 June 1986

Robert L Wernli, Roger Chapman
Paperback | Engels
€ 221,45
+ 442 punten
Levering 1 à 2 weken
Eenvoudig bestellen
Veilig betalen
Gratis thuislevering vanaf € 30 (via bpost)
Gratis levering in je Standaard Boekhandel

Omschrijving

There is now an awareness within the industry, particularly as oil companies direct considerable resources towards developing diverless production systems, that a fully integrated approach to equipment design and intervention is necessary to achieve an acceptable system. The requirement for an integrated approach to equipment design and intervention is applicable not only to diverless depths but to all subsea structures, equipment and intervention techniques in whatever depth. Fortunately the inherent dexterity of the diver does not impact so severely on design as other intervention techniques. However the benefits of an integrated approach are still applicable and the use of such simple "diver aids" as cutting guides and subsea markings installed prior to the installation of jackets and subsea equipment can have a significant impact on the cost of intervention. This paper examines the requirements and limitations in designing subsea equipment for Remotely Operated Vehicle (ROV) intervention. For the oil company embarking on the development of a diverless production system, be it totally diverless because of the envisaged water depth or primarily diverless with the possibility of diver back up, the intervention techniques adopted will strongly influence the final system design. The necessity to undertake an extensive development programme to produce the optimum intervention system is very costly, requires long lead times and comprehensive testing particularly where novel solutions are adopted. It is a daunting prospect for even the most progressive of oil companies.

Specificaties

Betrokkenen

Auteur(s):
Uitgeverij:

Inhoud

Aantal bladzijden:
366
Taal:
Engels

Eigenschappen

Productcode (EAN):
9789401083676
Verschijningsdatum:
26/07/2012
Uitvoering:
Paperback
Formaat:
Trade paperback (VS)
Afmetingen:
210 mm x 297 mm
Gewicht:
907 g
Standaard Boekhandel

Alleen bij Standaard Boekhandel

+ 442 punten op je klantenkaart van Standaard Boekhandel
CADEAU

Suske en Wiske & Jommeke trakteren

Koop hun avonturen nu voor slechts € 5!
CADEAU
actie strips
CADEAU

Een goed verhaal is geld waard

Krijg nu een € 4 voucher bij elke aankoop vanaf € 40
CADEAU
Terugkeeractie
E-BOOK ACTIE

Tot meer dan 50% korting

op een selectie e-books
E-BOOK ACTIE
E-bookactie korting
Standaard Boekhandel

Beoordelingen

We publiceren alleen reviews die voldoen aan de voorwaarden voor reviews. Bekijk onze voorwaarden voor reviews.