• Afhalen na 1 uur in een winkel met voorraad
  • Gratis thuislevering in België vanaf € 30
  • Ruim aanbod met 7 miljoen producten
  • Afhalen na 1 uur in een winkel met voorraad
  • Gratis thuislevering in België vanaf € 30
  • Ruim aanbod met 7 miljoen producten

Critical Path

An Essay on the Social Context of Literary Criticism

Northrop Frye
Paperback | Engels
€ 30,95
+ 61 punten
Levering 2 à 3 weken
Eenvoudig bestellen
Veilig betalen
Gratis thuislevering vanaf € 30 (via bpost)
Gratis levering in je Standaard Boekhandel

Omschrijving

This philosophic inquiry into fundamental problems of literature and society is an immensely important addition to the canon of one of America's most original and distinguished critics. What is the function of poetry? Of criticism? In what sense does the poet "know"? What is the relationship between a society and its art? Northrop Frye conducts us on an illuminating survey of these and other broad philosophic issues and offers many incidental insights into specific cultural phenomena as well. Such matters as Marxist aesthetics, Renaissance humanism, the relation of poetry to religion, the idea of progress, and the challenge of our contemporary youth culture are among the dozen interesting topics that engage his attention along the way.

Mr. Frye identifies two predominating ideologies in Western culture which he designates as the "myth of concern" and the "myth of freedom." A fully developed myth of concern, he writes, "compromises everything that it most concerns a society to know." Its purpose is to hold society together, hence its deeply conservative character. The "myth of freedom," on the other hand, embodies the "liberal" attitudes of objectivity and respect for the individual. The author traces the relative importance of these two myths from Homeric Greece to the present, relating them to the types of art and government they foster, the roles of the poet and critic, and many other topics. The final thesis of the two myths: "To maintain a free and mature society we have to become aware of the tension between concern and freedom, and the necessity of preserving them both."

In relating literature to this dialect, Mr. Frye ranges through the entire history of Western philosophy and literature--from Plato to Heidegger, from Sir Philip Sydney to Bob Dylan--showing us that his inquiring mind has once again gone beyond the field of literature, narrowly conceived, into the wider region of the history of ideas. He regards the artist and critic in generous terms--as persons not insulated from society but involved in it in the most profound sense and so provides a unique study informed by intelligence, broad learning, and grace and precision of style.

Specificaties

Betrokkenen

Auteur(s):
Uitgeverij:

Inhoud

Aantal bladzijden:
176
Taal:
Engels

Eigenschappen

Productcode (EAN):
9780253201584
Verschijningsdatum:
1/01/1971
Uitvoering:
Paperback
Formaat:
Trade paperback (VS)
Afmetingen:
133 mm x 203 mm
Gewicht:
204 g
Standaard Boekhandel

Alleen bij Standaard Boekhandel

+ 61 punten op je klantenkaart van Standaard Boekhandel
Cadeau

Dubbele punten

bij aankoop van een boek uit de selectie
Cadeau
Actie dubbele punten
AANGERADEN

De lente in je boekenkast

Ontdek onze boekentips om de lente fris, inspirerend en vol leesplezier te beleven
AANGERADEN
Boekentips lente 2026
Standaard Boekhandel

Beoordelingen

We publiceren alleen reviews die voldoen aan de voorwaarden voor reviews. Bekijk onze voorwaarden voor reviews.