• Afhalen na 1 uur in een winkel met voorraad
  • Gratis thuislevering in België vanaf € 30
  • Ruim aanbod met 7 miljoen producten
  • Afhalen na 1 uur in een winkel met voorraad
  • Gratis thuislevering in België vanaf € 30
  • Ruim aanbod met 7 miljoen producten
  1. Boeken
  2. Bedrijf & Technologie
  3. Informatica
  4. Software
  5. Create and Update an Unresourced Project using Elecosoft (Asta) Powerproject Version 15.2

Create and Update an Unresourced Project using Elecosoft (Asta) Powerproject Version 15.2

2-day training course handout and student workshops

Paul E Harris
Paperback | Engels
€ 78,45
+ 156 punten
Levering 2 à 3 weken
Eenvoudig bestellen
Veilig betalen
Gratis thuislevering vanaf € 30 (via bpost)
Gratis levering in je Standaard Boekhandel

Omschrijving

This book has been superceeded by Create and Update an Unresourced Project using Elecosoft (Asta) Powerproject Version 16: 2-day training course handout and student workshops - ISBN 9781925185812.

All scheduling software is difficult to learn for a number of reasons. None have the optimal settings when installed and templates, views and default options need to be adjusted to obtain the best possible performance. Usually the Help files do not connect the user to real life situations and do not explain the practical use of functions. Furthermore, there are many flicks and switches with obscure names that are difficult to understand or decide what they do or which are important. These issues make learning the software very difficult without a comprehensive guide written by an experienced user. Investing in a book written by Paul E Harris will address all these issues and allow you to setup the software properly and understand all the obscure functions letting you become productive more quickly and enhance your career opportunities and salary with a solid understanding of the software.


This book is designed as a student handout for a two-day training course and may also be used as a self-teach book. This course objectives are to teach participants:

- The user interface,

- How to create a projects,

- Scheduling projects without resources,

- Filters, Views, Sorts and Printing,

- Creating and assigning a baseline and

- Updating an un-resourced project.


Most chapters are reinforced by student workshops.


This book is written by an experienced scheduler, who has used the software at the sharp end of projects and is not a techo. It draws on the author's practical experience in using the software in a wide variety of industries. It presents workable solutions to real day to day planning and scheduling problems and contains practical advice on how to set up the software and import data.

Specificaties

Betrokkenen

Auteur(s):
Uitgeverij:

Inhoud

Aantal bladzijden:
214
Taal:
Engels

Eigenschappen

Productcode (EAN):
9781925185751
Verschijningsdatum:
1/10/2020
Uitvoering:
Paperback
Formaat:
Trade paperback (VS)
Afmetingen:
216 mm x 279 mm
Gewicht:
508 g
Standaard Boekhandel

Alleen bij Standaard Boekhandel

+ 156 punten op je klantenkaart van Standaard Boekhandel
Cadeau

Dubbele punten

bij aankoop van een boek uit de selectie
Cadeau
Actie dubbele punten
AANGERADEN

De lente in je boekenkast

Ontdek onze boekentips om de lente fris, inspirerend en vol leesplezier te beleven
AANGERADEN
Boekentips lente 2026
Standaard Boekhandel

Beoordelingen

We publiceren alleen reviews die voldoen aan de voorwaarden voor reviews. Bekijk onze voorwaarden voor reviews.